Manage Components linked to an Operation

On the Components tab, link components from the Works Order with specific Works Order operations.

For components linked to standard operations, MRP will calculate the required date for each component from the start date of its linked operation.

Components linked to a subcontract operation can be printed on subcontract despatch notes.

Note: If the component quantity does not match the unit of measure, the quantity is automatically adjusted to the nearest appropriate value.

 

Add links between Operations and Components

  • Select the Components tab.
  • Click Add to add a component.
  • Enter a Stock Code or select an existing reference from the drop-down list. The code entered must be a component on the Works Order.
  • The Sequence number is automatically copied from the linked component.
  • Enter a Quantity of the component which is linked to the operation. The quantity cannot be greater than the quantity of the linked component line.
  • The Unit of Measure of the linked component is displayed.

 

Amend links between Operations and Components

  • Select the Components tab.
  • Click on the component line to be amended. Overtype or select from the drop-down list in the Stock Code or Sequence to select a different component.
  • Click in Quantity and overtype the value to change the linked quantity.

 

Delete links between Operations and Components

  • Select the Components tab.
  • Click on the component line to be amended. Click Delete to remove the link to that component line.

 