Component Tab

View Components linked to an Operation

On the Components tab, components linked with specific Works Order operations are shown.

For components linked to standard operations, MRP would calculate the required date for each component from the start date of its linked operation.

Components linked to a subcontract operation can be printed on subcontract despatch notes.

  • Select the Components
  • The Sequence number is the sequence number of the linked component.
  • The Quantity is the quantity of the component which is linked to the operation.
  • The Unit of Measure of the linked component is displayed